Hi to you all,
I bought a Condo and I can hardly wait to move in. But before I can it is under going some major changes. It is a 2 bedroom, laundry room, deck with a slider, hall closet, pantry, kitchen, dining room and living room on the first floor. The down stairs was finished with a furnace room, storage room and full bathroom. On the main floor they widened the hallway 3 feet so I can get the wheelchair around and or the walker. The bathroom will have a walk in shower with bench and a sink that my chair will drive right under. The bathroom was allot of work because the walls, plumbing, electricity and duck work has all been changed. Soon they will paint all the rooms and fix the floors that have been changed. Then I can move in. Yeah!
Now for the up date on my leg. It's not working well and I am in allot of pain most of the time. My Dr. is bringing in another Dr. and when they can match their schedules , together they are redoing the full surgery again. My Dr. thinks it will be sometime in August. Please keep me in your prayers. I still hope to go to AZ in January to catch up with you all.
Love
Shellyrose
Tuesday, June 15, 2010
Subscribe to:
Posts (Atom)